LiveZilla Live Chat Software

Subscribe to our newsletter

Fill the details below to subscribe to our newsletter
* Email Address:
Please provide your email address
* Name:
Please provide your name.
* Confirmation Code:
Please provide the code as displayed on the image
verification image, type it in the box
Thank your for your email.
There was an error while trying to save your details, please try again later
Address
54, Vasileos Constantinou, Erimoudes Court, 1st Floor, 3075, Limassol, Cyprus
Mail Address
P.O Box 51433, Postal Code 3505, Limassol, Cyprus
Phone
+357 7000 88 00
Fax
+357 7000 88 05
Email Enquiries
info@ataleza.com

Custom-Buil Homes

 

STEP 1 – Preparation and Design


Since you have chosen a plot from our portfolio we are now ready to receive your input of how the house should look like and what special needs you might have. Once our architect and civil engineer have all the information, will prepare the design and take all necessary steps to acquire the required licenses from the Government to start the construction.

 

STEP 2 – Site Works


Once all the required licenses are ready, the head of our technical department will visit the site and with the help of an expert topographer using GPS technology will mark on the land, all the boundaries of the house. Once its marked next step is to lay several layers of gravel and by using a compactor we will compact the gravel until it reaches over 96% of compaction sustainability.

 

 

 

 

 

STEP 3 – Foundation


The foundation process takes approximately one month to be completed according to the complexity of the project at hand but usually is maximum one month for a normal house. The foundation is an important process of the construction of the house since all the piping is passed through it and will be very difficult to fix afterwards in case of a problem.

 

 

 

 

STEP 4 – Construction of structural frame (Concrete)


We are now ready to start shaping the house by constructing the concrete frame of the ground floor followed by the first slab. The process requires a lot of hard work from all the construction specialists since the whole house relays on this frame. The process will take approximately one month for each floor to be completed. After that we are ready to start constructing the walls.

 

 

 

 

 

STEP 5 – Construction of walls


Once the structural frame is complete our team will start building the walls and letting them dry for a couple of days in order to get their final shape. Upon completing the construction of the walls, we will start the wall renderings according to the design. We always use 3 hands of thermal plaster. Once the walls are dried and passed with a hand of spatula, the aluminum windows and doors are installed.

 

STEP 6 – Wood work and sanitary installation


All the woodwork is pre fabricated at our carpenter's workshop and installed upon completion of the walls and installation of the floor tiles. Once the wood work is in place then we proceed with the sanitary installation and any other final finishes which are needed according to the design.

 
 
 

STEP 7 – Landscaping and delivering the project


Upon completion of the project, our expert landscape designer will start his work giving the final touch to the project. A final check from our technical department is carried down and if approved by our experts we finally deliver the project to the owner.

Properties for Sale
Apartments
Villas
Houses
Exclusive Land
Customer Support & Services
Buyer's Guide
Property Management
Insurance
Sell or Rent your Property
Important Info & Help
Property FAQs
Property News
Make a career in Ataleza Developers
Employment Opportunities
Property Tools
Mortgage Calculator
Stamp Duty Calculator
Transfer Fees Calculator
Currency Converter
Copyright Ataleza Property Developers, Limassol, Cyprus | Disclaimer | Sitemap | Site Credits